How statement and proof provenance work
The first chip identifies the source of the statement or construction; the second identifies the source of its local proof or verification.
- Literature-sourced: the exact statement appears in a cited source; only wording and notation differ.
- AI-adapted: a semantically identical restatement of literature-sourced material, modulo indexing, notation, and boundary cases adopted by the library.
- AI-generated: a genuinely novel statement formulated by AI, with no source for the claim itself.
These labels describe origin, not correctness: citations and verification chips remain separate evidence.
Nondecaying correction variance can force cubic cost
Statement refuted
Bias order one and per-sample work alone guarantee the logarithmic MLMC work bound .
Facts & Assumptions
Given: The finite MLMC hierarchy, the claimed universal complexity bound above, and the counterexample construction below.
Geometric MLMC hierarchy and coupled corrections: adjacent-level couplings need only have the correct marginal laws, and level sample blocks are independent.
Expectation, variance, and MSE of a finite MLMC estimator: the MLMC MSE is squared finest-level bias plus the sum of each correction variance divided by its sample count.
Counterexample
Let , , , target , and where each is Rademacher. At level , couple the fine and coarse marginals independently: use independent Rademacher variables and and set At level , use . Take the level sample blocks independent and charge work per draw.
Given: Any finite level and positive integer sample counts for which the estimator has MSE at most .
Since , the finest-level bias is , so this hierarchy has bias order . For , the independent centered Rademacher terms have variance , hence and no bound holds for any . The sample cost is exactly .
By [F2], the MSE is Thus MSE at most requires and . The finest-level work alone is therefore . This grows faster than , so the claimed logarithmic bound fails without a positive correction-variance decay rate.
Depends on
Used by
Nothing in the library uses this result yet.
Dependency tree · two levels
5 results within two dependency steps of this one, each drawn at its shortest distance from it. An arrow runs from a result to what uses it, so the chart reads left to right and ends at this result, which carries a heavier outline. Every node is a link to that result. Click elsewhere on the chart to enlarge it.
Sources
- Michael B. Giles, Multilevel Monte Carlo Path Simulation, §3 (standard reference, not scraped)