Alphabeta Math
ExampleConstruction: AI-generatedVerification: AI-generatedPipeline-generatedprecheck pass
How statement and proof provenance work

The first chip identifies the source of the statement or construction; the second identifies the source of its local proof or verification.

  • Literature-sourced: the exact statement appears in a cited source; only wording and notation differ.
  • AI-adapted: a semantically identical restatement of literature-sourced material, modulo indexing, notation, and boundary cases adopted by the library.
  • AI-generated: a genuinely novel statement formulated by AI, with no source for the claim itself.

These labels describe origin, not correctness: citations and verification chips remain separate evidence.

A finite-class M-estimator and its uniform law

Example

Let 0<p≤1 and let X1,X2,… be IID Bernoulli(p). Write Xˉn=n−1∑i=1nXi. Take Θ={0,1} with distance d(θ,η)=∣θ−η∣, and set m0(x)=0 and m1(x)=x. Let θ^n=1 when Xˉn>0 and θ^n=0 when Xˉn=0. Then θ^n is an exact M-estimator and is consistent for the unique population maximizer θ0=1. This finite criterion class has a uniform law; the proof below gives the Bernoulli strong law directly.

Facts & Assumptions

Given: 0<p≤1, the IID Bernoulli observations, the finite parameter set Θ={0,1}, and the displayed criterion and estimator.

[F1]

M-estimators: A data-measurable estimator satisfying Pnmθ^n=sup⁡θ∈ΘPnmθ is an exact maximizing M-estimator.

[F2]

Identical distribution and IID families: IID means identically distributed with the whole family mutually independent.

[F3]

Pointwise consistency in probability: Consistency at a fixed target means the probability of every fixed positive metric error tends to zero.

[F4]

The absolute value makes R a metric space: d(x,y)=∣x−y∣ is a metric, its open balls are the intervals (x−r,x+r), and it is unbounded: The usual metric on R is d(x,y)=∣x−y∣; on Θ={0,1} the distance used here is its restriction, which remains a metric because the metric axioms persist on subsets.

[F5]

Estimator sequences in IID experiments: The IID sample-size-n space is a finite product space, and an estimator is a measurable map on that space.

[A1]

The observations are Bernoulli(p), so EXi=p and Yi=Xi−p satisfies EYi=0 and ∣Yi∣≤1.

[A2]

The criterion class consists only of the two functions m0(x)=0 and m1(x)=x.

Verification

1.1A1A2F1F2F5given

The population criterion is M(0)=0 and M(1)=EX1=p>0, so its unique maximum is θ0=1. The empirical criteria are Mn(0)=0 and Mn(1)=Xˉn≥0; the displayed selection therefore attains their maximum for every sample. By [F5], the sample space is {0,1}n with its product sigma-algebra. Each singleton vector is a measurable rectangle, and every subset is a finite union of singletons, so every data map is measurable. The estimator is exact by [F1].

1.2A1A2F2algebra

Independence and the Bernoulli finite sample law imply that expectations of products of functions of distinct coordinates factor: the joint mass at each (x1,…,xn)∈{0,1}n is ∏iP(Xi=xi), and summing this product over the finite sample space factors. Expanding (∑iYi)4, every term with an index occurring once has expectation zero by EYi=0 and this factorization; the remaining terms are ∑iEYi4+6∑i<jEYi2EYj2≤n+6(n2)≤3n2. For Z≥0 and t>0, t1{Z>t}≤Z, so integrating gives P(Z>t)≤EZ/t. Applying this to Z=(∑iYi)4 gives P(∣Xˉn−p∣>ε)≤3/(n2ε4).

2.1step 1.2givenalgebra

For fixed ε>0, the bound in step 1.2 is summable in n. By the union bound, P(⋃n≥N{∣Xˉn−p∣>ε})≤∑n≥N3/(n2ε4)→0; hence only finitely many such deviations occur almost surely. Applying this to ε=1/j for every positive integer j gives Xˉn→p almost surely.

3.1A1A2F3F4step 1.2step 2.1given∎

For 0<ε<1, the metric-error event is {θ^n=0}={Xˉn=0}, which is contained in {∣Xˉn−p∣>p/2}. Step 1.2 bounds its probability by 3/(n2(p/2)4)→0; for ε≥1 the error event is empty. Hence θ^n is consistent by [F3] in the metric of [F4]. Also, since p>0, step 2.1 implies that θ^n=1 eventually almost surely, and sup⁡θ∈Θ∣Mn(θ)−M(θ)∣=∣Xˉn−p∣→0 almost surely, displaying the finite-class uniform law.

Depends on

Used by

Nothing in the library uses this result yet.

Dependency tree · two levels

33 results within two dependency steps of this one, each drawn at its shortest distance from it. An arrow runs from a result to what uses it, so the chart reads left to right and ends at this result, which carries a heavier outline. Every node is a link to that result. Click elsewhere on the chart to enlarge it.

Sources