Alphabeta Math
ExampleConstruction: AI-generatedVerification: AI-generatedPipeline-generatedprecheck pass
How statement and proof provenance work

The first chip identifies the source of the statement or construction; the second identifies the source of its local proof or verification.

  • Literature-sourced: the exact statement appears in a cited source; only wording and notation differ.
  • AI-adapted: a semantically identical restatement of literature-sourced material, modulo indexing, notation, and boundary cases adopted by the library.
  • AI-generated: a genuinely novel statement formulated by AI, with no source for the claim itself.

These labels describe origin, not correctness: citations and verification chips remain separate evidence.

A one-pivot primal and dual certificate trace

Example

First consider min⁡x1+2x2 subject to x1+x2=1 and x1,x2≥0. Start from basis B=(2), so x=(0,1), y=2, and cˉ1=−1. The primal ratio test pivots x1 in at θ=1; the new basis is B=(1) with x=(1,0), y=1, and cˉ2=1.

For the same A and c but right-hand side b=−1, the basis B=(1) remains dual feasible and has basic value x1=−1. The dual-simplex row has no negative nonbasic coefficient, giving a Farkas certificate.

Facts & Assumptions

Given: The exact two-variable LP data in the Example and the basis definitions and pivot results below.

[F1]

Basis dictionaries and reduced costs for revised simplex: The basic vector x(B) is defined by xB(B)=AB−1b and xj(B)=0 for j∈N; the basis is primal feasible, and x(B) is a basic feasible solution, exactly when AB−1b≥0.

[F2]

Primal revised-simplex pivot identities and certificates: At a primal-feasible basis, a nonbasic j with cˉj<0 and some positive entry of d=AB−1aj admits a feasible minimum-ratio pivot with objective change θcˉj. If all nonbasic reduced costs are nonnegative at a primal-feasible basis, its basic vector is optimal.

[F3]

Dual-simplex invariant and Farkas infeasibility certificate: At a dual-feasible basis, for a row i with xBi<0, if there is no nonbasic j with dij=(AB−1aj)i<0, then q=AB−Tei satisfies ATq≥0 and bTq<0.

Verification

1.1F1givenalgebra

With B=(2), AB=1, x2=1, and y=c2=2. Thus cˉ1=1−2=−1, so x1 is a valid entering variable.

1.2F1givenalgebra

For the changed right-hand side b=−1 and basis B=(1), x1=−1 while y=1 and cˉ2=1≥0, so the basis is dual feasible and primal infeasible. Its only nonbasic coefficient is d12=AB−1a2=1≥0.

2.1F1F2step 1.1algebra

The direction coefficient is d=AB−1a1=1 and the ratio is x2/d=1. The pivot yields x1=1,x2=0 and changes cost by 1⋅(−1)=−1, from 2 to 1.

3.1F1F2step 2.1algebra

At the new basis B=(1), y=c1=1 and cˉ2=2−1=1≥0. The vector is feasible, so [F2] proves it is optimal; the primal and dual objective values are both 1.

4.1F3step 1.2algebra∎

There is no eligible negative coefficient. The certificate from [F3] is q=1, for which ATq=(1,1)≥0 and bTq=−1<0. Thus the modified system has no nonnegative feasible vector.

Depends on

Used by

Nothing in the library uses this result yet.

Dependency tree · two levels

7 results within two dependency steps of this one, each drawn at its shortest distance from it. An arrow runs from a result to what uses it, so the chart reads left to right and ends at this result, which carries a heavier outline. Every node is a link to that result. Click elsewhere on the chart to enlarge it.

Sources