How statement and proof provenance work
The first chip identifies the source of the statement or construction; the second identifies the source of its local proof or verification.
- Literature-sourced: the exact statement appears in a cited source; only wording and notation differ.
- AI-adapted: a semantically identical restatement of literature-sourced material, modulo indexing, notation, and boundary cases adopted by the library.
- AI-generated: a genuinely novel statement formulated by AI, with no source for the claim itself.
These labels describe origin, not correctness: citations and verification chips remain separate evidence.
The convex constant-step stability bound is linear in the step count
Example
Let , , and let , , and be measurable spaces. Let be a probability measure on , let be measurable, and let be measurable for every . For put and assume and are jointly measurable. For every , assume is totally differentiable and convex, its gradient is -Lipschitz, and its values satisfy . Let be IID with law , and define and . Let be independent of with for each ; dependence across times is allowed. From fixed , run and assume the resulting loss and risk maps are measurable and integrable. For the constant schedule , the stability and absolute expected-generalization upper bound is , which is linear in as a bound. This is an upper-bound calculation, not a lower bound on the actual stability or generalization gap.
Example references
Expected generalization of convex stochastic gradient training supplies the convex SGD stability and expected-gap bound.
Hardt, Recht, and Singer, arXiv-version Theorem 3.8 (conference Theorem 3.7): full arXiv paper.
Facts & Assumptions
Given: , , the convex theorem hypotheses, and the constant schedule .
Expected generalization of convex stochastic gradient training: for admissible deterministic steps, stability and the absolute expected-generalization gap are at most .
Verification
Since , every step meets the convex theorem's step-size condition. The sum of the equal steps is .
Substituting this sum into [F1] gives .
For fixed positive , the displayed right-hand side is a constant multiple of . It bounds the stability and expected gap from above and yields no corresponding lower bound.
Depends on
Used by
Nothing in the library uses this result yet.
Dependency tree · two levels
13 results within two dependency steps of this one, each drawn at its shortest distance from it. An arrow runs from a result to what uses it, so the chart reads left to right and ends at this result, which carries a heavier outline. Every node is a link to that result. Click elsewhere on the chart to enlarge it.