Alphabeta Math
ExampleConstruction: AI-generatedVerification: AI-generatedPipeline-generatedprecheck passjudge pass (gpt-6-luna)
How statement and proof provenance work

The first chip identifies the source of the statement or construction; the second identifies the source of its local proof or verification.

  • Literature-sourced: the exact statement appears in a cited source; only wording and notation differ.
  • AI-adapted: a semantically identical restatement of literature-sourced material, modulo indexing, notation, and boundary cases adopted by the library.
  • AI-generated: a genuinely novel statement formulated by AI, with no source for the claim itself.

These labels describe origin, not correctness: citations and verification chips remain separate evidence.

Zero-initialized descent on an underdetermined system

Example

Take X=[1 1]∈R1×2, y=1, and F(w)=12(w1+w2−1)2. Starting from w0=(0,0), use fixed step η=14. The iterates are wk=12(1−2−k)(1,1) and converge to (12,12), the unique minimum-Euclidean-norm least-squares solution among the nonunique minimizers w1+w2=1.

Facts & Assumptions

Given: The stated matrix, response, objective, initial vector, and fixed step.

[F1]

Zero-initialized gradient descent selects minimum-norm least squares: when X≠0 and 0<η≤1/λmax⁡(XTX), zero-initialized gradient descent converges to the unique minimum-norm least-squares minimizer.

Verification

1.1givenF1algebra

Here XTX=(1111) has eigenvalues 2 and 0, so λmax⁡=2 and 0<η=14≤12. Thus the general selector theorem [F1] applies.

2.1givenstep 1.1algebrainduction

If wk=(ak,ak), then ∇F(wk)=(2ak−1)(1,1) and the update gives ak+1=ak−14(2ak−1)=12ak+14. Starting with a0=0, induction yields ak=12(1−2−k), so wk→(12,12).

3.1givenstep 2.1algebra∎

The least-squares minimum is zero, attained exactly when w1+w2=1. For every such vector, w12+w22=12+12(w1−w2)2≥12, with equality exactly when w1=w2=12. Hence (12,12) is the unique minimum-norm solution reached in step 2.1.

Depends on

Used by

Nothing in the library uses this result yet.

Dependency tree · two levels

5 results within two dependency steps of this one, each drawn at its shortest distance from it. An arrow runs from a result to what uses it, so the chart reads left to right and ends at this result, which carries a heavier outline. Every node is a link to that result. Click elsewhere on the chart to enlarge it.