Alphabeta Math
ExampleConstruction: Literature-sourcedVerification: AI-generatedPipeline-generated
How statement and proof provenance work

The first chip identifies the source of the statement or construction; the second identifies the source of its local proof or verification.

  • Literature-sourced: the exact statement appears in a cited source; only wording and notation differ.
  • AI-adapted: a semantically identical restatement of literature-sourced material, modulo indexing, notation, and boundary cases adopted by the library.
  • AI-generated: a genuinely novel statement formulated by AI, with no source for the claim itself.

These labels describe origin, not correctness: citations and verification chips remain separate evidence.

A one-sample weighted importance-sampling estimate can be biased

Example

Assume the Axiom of Choice for the policy path laws. Let the state set be {s,d}, with actions A(s)={a,b} and A(d)={c}. The discount is γ=0, and episodes stop on first reaching terminal state d. At s, both actions transition to d; action a gives reward 1 and action b gives reward 0. At d, action c returns to d with reward 0. Let the target policy choose (a,b) with probabilities (3/4,1/4) and the behavior policy choose them with probabilities (1/4,3/4); both choose c at d. Target support holds. For one behavior episode, the self-normalized weighted importance-sampling estimate is the observed reward, so its expectation is 1/4, whereas the target value is 3/4. Its finite-sample bias is −1/2.

Facts & Assumptions

Given: The one-decision finite MDP, its terminal state, γ=0, the Axiom of Choice for the policy path laws, target and behavior action probabilities, and the one-sample weighted estimator.

[F1]

Finite Markov decision process with joint reward-transition law: action a produces reward 1 and action b produces reward 0, with both transitioning to d.

[F2]

Episodic returns, temporal-difference errors, and policy support: the likelihood ratio for the one-step episode is π(A0∣s)/μ(A0∣s); both possible behavior actions have positive target probability.

[F3]

First-visit Monte Carlo policy evaluation: the weighted estimate is ∑iWiGi/∑iWi when the denominator is positive.

[F4]

Expectation of a nonnegative or integrable random variable: for a finite-valued variable, expectation is the sum of its values weighted by their probabilities.

Proof

1.1givenF2F3algebra

If the observed action is a, its importance weight is (3/4)/(1/4)=3 and its return is 1; if it is b, its weight is (1/4)/(3/4)=1/3 and its return is 0. In either case the one-sample weighted estimator in [F3] reduces to W1G1/W1=G1, and the denominator is strictly positive.

2.1givenF1F4step 1.1algebra∎

Under behavior, action a occurs with probability 1/4 and action b with probability 3/4, so [F4] and step 1.1 give expected one-sample estimate Eμ[G1]=(1/4)1+(3/4)0=1/4. Under the target policy, the state value is Vπ(s)=(3/4)1+(1/4)0=3/4. Their difference is 1/4−3/4=−1/2, proving finite-sample bias.

Depends on

Used by

Nothing in the library uses this result yet.

Dependency tree · two levels

22 results within two dependency steps of this one, each drawn at its shortest distance from it. An arrow runs from a result to what uses it, so the chart reads left to right and ends at this result, which carries a heavier outline. Every node is a link to that result. Click elsewhere on the chart to enlarge it.

Sources