How statement and proof provenance work
The first chip identifies the source of the statement or construction; the second identifies the source of its local proof or verification.
- Literature-sourced: the exact statement appears in a cited source; only wording and notation differ.
- AI-adapted: a semantically identical restatement of literature-sourced material, modulo indexing, notation, and boundary cases adopted by the library.
- AI-generated: a genuinely novel statement formulated by AI, with no source for the claim itself.
These labels describe origin, not correctness: citations and verification chips remain separate evidence.
A Neumann defect bounds the inverse norm
Statement
Let , , and let satisfy . Then is invertible and
Facts & Assumptions
Given: as in the statement.
If , then is invertible (A finite matrix within unit distance of the identity is invertible).
The operator norm is submultiplicative (The operator norm is submultiplicative and satisfies ||T^*T|| = ||T||^2).
The operator norm is induced by the Euclidean vector norm (The operator norm is zero on the zero domain and otherwise is max_{||v||=1} ||Tv||).
Proof
Since , [F1] gives that exists.
Put . By induction and [F2], , so by [F3]. The finite identity , multiplied on the left by , gives and hence . By the triangle inequality from [F3] and submultiplicativity [F2], . Since , division gives . This proves the inverse norm bound without taking a limit of matrices.
Depends on
Used by
- Finite-budget CARE and DARE candidate extraction from ordered Schur and QZ forms Algorithm
- Finite-budget exact or safeguarded inexact Newton-Kleinman policy iteration Algorithm
- Finite-budget stable block reordering for Schur and QZ forms Algorithm
- Separated DARE pencils have quantitatively stable deflating graphs Proposition
- A uniform approximate inverse and residual enclose every linear solution Theorem
- Finite-budget stable block reordering has exact adjacent-swap correctness and status Theorem
Dependency tree · two levels
6 results within two dependency steps of this one, each drawn at its shortest distance from it. An arrow runs from a result to what uses it, so the chart reads left to right and ends at this result, which carries a heavier outline. Every node is a link to that result. Click elsewhere on the chart to enlarge it.
Sources
- Siegfried M. Rump, Verification methods: Rigorous results using floating-point arithmetic, Acta Numerica 19 (2010), §10.5 (standard reference, not scraped)
- Nicholas J. Higham, Numerical Linear Algebra and Matrix Analysis, MIMS EPrint 2015.103, §1 (standard reference, not scraped)