How statement and proof provenance work
The first chip identifies the source of the statement or construction; the second identifies the source of its local proof or verification.
- Literature-sourced: the exact statement appears in a cited source; only wording and notation differ.
- AI-adapted: a semantically identical restatement of literature-sourced material, modulo indexing, notation, and boundary cases adopted by the library.
- AI-generated: a genuinely novel statement formulated by AI, with no source for the claim itself.
These labels describe origin, not correctness: citations and verification chips remain separate evidence.
MLMC cost complexity under bias, variance, and work rates
Statement
Let be an integer, , and . Let be an integrable real target. Suppose we are given an infinite compatible hierarchy: for every a square-integrable level approximation , and for every a fixed coupling of the laws of and . Define and, under each coupling, . For each finite , use the first levels and their couplings, with independent sample blocks across levels, as in Geometric MLMC hierarchy and coupled corrections. Suppose there are constants and exponents and such that, for every , and the work for one level- correction sample is at most . For every sufficiently small , there are a finite level and positive integer sample counts for which the estimator of Geometric MLMC hierarchy and coupled corrections satisfies and its total work has the following upper bounds, with constants independent of : This is an upper bound under the three rate assumptions; it does not assert a matching lower bound or that the rates hold for a particular discretization.
Facts & Assumptions
Given: The infinite compatible hierarchy and target above, , , positive constants , the bias and correction-variance bounds, and the per-sample work bound. Every finite prefix, with independent level sample blocks, satisfies the definition cited in the Statement.
Geometric MLMC hierarchy and coupled corrections: the geometric mesh widths are .
Geometric MLMC hierarchy and coupled corrections: the estimator is the sum of level sample means, with independent sample blocks at distinct levels.
Expectation, variance, and MSE of a finite MLMC estimator: its mean is , its variance is , and its MSE is that variance plus squared bias.
Proof
Given: The rate hypotheses in the Statement.
For sufficiently small , choose Then . The ceiling also gives and .
Put , , and . Choose Each is a positive integer. Since and , [F3] gives The bias bound from step 1.1 and the MSE identity [F3] imply the required MSE bound.
The ceiling inequality and the per-sample work bound imply Because , the geometric-series formula gives
If , put . Then The first term in step 2.2 is . Its rounding term is also , since .
If , then by step 1.1. The first term in step 2.2 is therefore , and its rounding term is no larger for sufficiently small , again because .
If , put . Then The lower geometric bound from step 1.1 gives , so . The first term in step 2.2 is . The rounding term is smaller because .
The estimates in steps 3.1–3.3 cover respectively , , and . Each case gives the stated total-work upper bound while step 2.1 gives the same MSE bound.
Depends on
Used by
- Autonomous all-moment Euler MLMC logarithmic cost Corollary
- Finite-L2 strong and conditional weak Euler MLMC cost Corollary
- MLMC work bound for bounded finite-state Poisson tau-leaping Corollary
- A discontinuous payoff with bias order one and variance order one-half Example
- Milstein MLMC correction variance and inverse-epsilon-squared cost Theorem
Dependency tree · two levels
5 results within two dependency steps of this one, each drawn at its shortest distance from it. An arrow runs from a result to what uses it, so the chart reads left to right and ends at this result, which carries a heavier outline. Every node is a link to that result. Click elsewhere on the chart to enlarge it.
Sources
- Michael B. Giles, Multilevel Monte Carlo Path Simulation, Theorem 3.1 and proof (standard reference, not scraped)
- Christoph Reisinger, Stochastic Simulation: Lecture 9a, Multilevel Monte Carlo Theory, slides 9–12 (standard reference, not scraped)