Alphabeta Math
AlgorithmAlgorithm: Literature-sourcedProof: Not applicablePipeline-generatedjudge pass (gpt-6-luna)verified 2026-10-22 (gpt-6.1-sol)
How statement and proof provenance work

The first chip identifies the source of the statement or construction; the second identifies the source of its local proof or verification.

  • Literature-sourced: the exact statement appears in a cited source; only wording and notation differ.
  • AI-adapted: a semantically identical restatement of literature-sourced material, modulo indexing, notation, and boundary cases adopted by the library.
  • AI-generated: a genuinely novel statement formulated by AI, with no source for the claim itself.

These labels describe origin, not correctness: citations and verification chips remain separate evidence.

Measurement-guided reverse-kernel reconstruction

Definition

Let N≥1 be finite, let 0=t0<t1<⋯<tN, let d≥1 and let the state space be Rd, and let (Y,Y) be a measurable observation space. Fix a measurable forward operator A:Rd→Y, an observation y∈Y, and a nonnegative measurable likelihood function ℓy:Rd→[0,∞) obtained by fixing y in a likelihood density relative to a fixed sigma-finite measure on Y. A measurement-guided reverse-kernel reconstruction procedure takes a finite Borel score field s^θ:Rd×{t0,…,tN}→Rd; a terminal reference probability νN on the Borel sets of Rd and a sampler that returns an exact draw or failure within finite initialization budget binit; and, for each k, a measurable correction space (Ck,Ck), its failure-augmented measurable space Ck†=Ck⊔{⊥} with σ-algebra Ck†={D,D∪{⊥}:D∈Ck}, a measurable correction map Ck,s^θ,A,ℓy:Rd×Y→Ck†, a probability kernel Qθ,k(⋅∣x,y,a) from Rd×Y×Ck with its product sigma-algebra to Rd with its Borel sigma-algebra, and a sampler that returns an exact draw from that kernel or failure within finite per-step budget bk. The correction map may use the supplied score, forward operator and likelihood and, when supplied for the exact-score option, the prior and scale map. It may also take, for each step, a declared Borel map Πk−1:Rd→Rd and a Borel admissible set Ak−1⊆Rd. Each per-step budget includes correction evaluation, kernel sampling and any declared projection. First draw xN from νN within binit; if initialization fails, return the terminal-initialization failure status. For k=N,N−1,…,1, compute ak=Ck,s^θ,A,ℓy(xk,y); if ak=⊥, return the correction failure status at k; otherwise draw xk−1 from Qθ,k(⋅∣xk,y,ak) within bk; if drawing fails, return the sampling failure status at k; if Πk−1 is supplied, apply it to xk−1 and return the admissibility failure status at k−1 if evaluation fails or its output is outside Ak−1. If k>1, continue at k−1 with the resulting state xk−1; if k=1, return x0 with completed status. A correction may use a declared surrogate without additional likelihood or noising assumptions. If it uses the exact measurement score at step k, the caller must also declare a Borel probability measure μ on Rd and a map σ:{t1,…,tN}→(0,∞) associating each reverse-schedule time with its Gaussian-noising scale. For every such step, the forward noising convention at tk must be Xσ(tk)=X0+σ(tk)Z, where X0∼μ and Z∼N(0,Id) is independent of X0, and the observation variable Y with conditional density ℓy must be conditionally independent of Z given X0, and ℓy must be bounded, strictly positive and Borel measurable with 0<Zy=∫ℓy(u) μ(du)<∞. The exact correction then uses gσ(tk)(xk,y)=∇xlog⁡∫ℓy(u)Qσ(tk)(xk,du), with Qσ(tk) formed from this prior and Gaussian noising as in the conditional-score and Tweedie identities. The procedure returns an algorithmic sample; it makes no posterior-exactness claim unless the terminal law and all transition and projection conditions are separately certified.

diagram failed to render:
\begin{tikzpicture}[>=stealth]
  \node[draw,rounded corners,align=center] (init) at (0,0) {draw $x_N\sim\nu_N$ within $b_{\mathrm{init}}$};
  \node[draw,rounded corners,align=center] (corr) at (3.5,0) {$a_k=C_k(x_k,y)$; check $a_k\ne\bot$};
  \node[draw,rounded corners,align=center] (kernel) at (7.5,0) {draw $x_{k-1}\sim Q_{\theta,k}(\cdot\mid x_k,y,a_k)$};
  \node[draw,rounded corners,align=center] (proj) at (11.5,0) {optional $\Pi_{k-1}$; check $A_{k-1}$};
  \node[draw,diamond,aspect=2,align=center] (next) at (15.3,0) {$k=1?$};
  \node[draw,rounded corners,align=center] (out) at (15.3,-1.8) {return $x_0$};
  \node[draw,rounded corners,align=center] (stop) at (7.5,-2.2) {first failure status};
  \draw[->] (init)--(corr);
  \draw[->] (corr)--(kernel);
  \draw[->] (kernel)--(proj);
  \draw[->] (proj)--(next);
  \draw[->] (next.south)--node[right]{$k=1$}(out.north);
  \draw[->] (next.north) -- ++(0,1.5) -| node[pos=0.25,above,align=center]{$k>1$: continue at $k-1$\\with the just-produced state}(corr.north);
  \draw[->] (init.south)--(stop.north);
  \draw[->] (corr.south)--(stop.north);
  \draw[->] (kernel.south)--(stop.north);
  \draw[->] (proj.south)--(stop.north);
\end{tikzpicture}

The upper return arrow repeats the reverse step with the newly produced state and decremented index. The downward arrows record immediate stopping at a failed initialization, correction, kernel draw, or declared projection. The diagram is an operational flow description and asserts no distributional identity.

Depends on

Used by

Dependency tree · two levels

8 results within two dependency steps of this one, each drawn at its shortest distance from it. An arrow runs from a result to what uses it, so the chart reads left to right and ends at this result, which carries a heavier outline. Every node is a link to that result. Click elsewhere on the chart to enlarge it.

Sources