Alphabeta Math
AlgorithmAlgorithm: AI-adaptedProof: Not applicablePipeline-generatedjudge pass (gpt-6-luna)
How statement and proof provenance work

The first chip identifies the source of the statement or construction; the second identifies the source of its local proof or verification.

  • Literature-sourced: the exact statement appears in a cited source; only wording and notation differ.
  • AI-adapted: a semantically identical restatement of literature-sourced material, modulo indexing, notation, and boundary cases adopted by the library.
  • AI-generated: a genuinely novel statement formulated by AI, with no source for the claim itself.

These labels describe origin, not correctness: citations and verification chips remain separate evidence.

Explicit Euler characteristic backtracking with multilinear interpolation

Definition

Inputs are a periodic grid from Periodic tensor grids and multilinear interpolation, a finite horizon T>0, a positive integer M of time steps, a periodic C1 velocity b, periodic initial data u0, node values Ui0=u0(xi), and a nonnegative integer step budget B. Write Δt=T/M and tn=nΔt. The output is either success with U0,…,UM, or budget-exhausted with no partial final state.

  1. If B<M, return budget-exhausted before changing the input data.
  2. For n=0,…,M−1 and each arrival node xi, compute the explicit backward Euler foot lift x~i n:=xi−Δt b(tn+1,xi). Reduce each coordinate modulo its period when evaluating the periodic interpolant.
  3. Set Uin+1:=IhUn(x~i n).
  4. After the M finite updates, return success with all node arrays.

The finite step budget counts time updates. Every update evaluates one foot per grid node and a finite sum of 2d interpolation terms. The procedure imposes no bound on ∥b∥Δt/h; the floor-and-fraction convention in the interpolation definition applies even when a foot crosses many grid cells.

Remarks

This algorithm is the periodic-box branch. It does not wrap a foot through a nonperiodic boundary. An inflow/exit implementation must instead use an explicit first-hit oracle and return an unresolved status when the first hit or its error certificate is not resolved; A transverse backward boundary hit has a certified time and trace error bound records the transverse error interface. No grazing, simultaneous, or unbounded event sequence is hidden in the periodic update.

The algorithm defines tensor-product multilinear interpolation only. A higher-order replacement needs its own operator-norm or limiter bound and its own interpolation defect estimate; high order alone does not imply L∞ contractivity.

Depends on

Used by

Dependency tree · two levels

8 results within two dependency steps of this one, each drawn at its shortest distance from it. An arrow runs from a result to what uses it, so the chart reads left to right and ends at this result, which carries a heavier outline. Every node is a link to that result. Click elsewhere on the chart to enlarge it.

Sources