Alphabeta Math
CounterexampleConstruction: Literature-sourcedVerification: AI-adaptedPipeline-generated
How statement and proof provenance work

The first chip identifies the source of the statement or construction; the second identifies the source of its local proof or verification.

  • Literature-sourced: the exact statement appears in a cited source; only wording and notation differ.
  • AI-adapted: a semantically identical restatement of literature-sourced material, modulo indexing, notation, and boundary cases adopted by the library.
  • AI-generated: a genuinely novel statement formulated by AI, with no source for the claim itself.

These labels describe origin, not correctness: citations and verification chips remain separate evidence.

A controlled braid phase is observable

Statement refuted

A scalar phase that is irrelevant for an uncontrolled fixed-sector braid remains irrelevant when that braid is coherently controlled.

Facts & Assumptions

Given: A control qubit with basis ∣0⟩,∣1⟩, the target space C, and a control-first controlled-unitary convention.

[F1]

The phase-insensitive projective class identifies I and −I on the one-dimensional target. Projective braid gate and operator metric

[F2]

A controlled global phase becomes a relative control phase and is observable by a two-outcome measurement. A Controlled Global Phase Becomes a Relative Control Phase

Counterexample

Given: The target starts in the unit vector 1∈C, the control starts in ∣+⟩=(∣0⟩+∣1⟩)/2, and the measurement is in the {∣+⟩,∣−⟩} basis.

1.1givenF1algebra

Uncontrolled on C, the gates I and −I differ by the scalar −1, so they have the same projective class by [F1].

2.1givenF2step 1.1algebra∎

The controlled I is the identity, so it leaves the control in ∣+⟩ and the + outcome has probability 1. The controlled −I is diag⁡(1,−1) on the control; it maps ∣+⟩ to ∣−⟩, so the same outcome has probability 0. Thus the controlled outcome laws differ, refuting the statement.

Depends on

Used by

Nothing in the library uses this result yet.

Dependency tree · two levels

32 results within two dependency steps of this one, each drawn at its shortest distance from it. An arrow runs from a result to what uses it, so the chart reads left to right and ends at this result, which carries a heavier outline. Every node is a link to that result. Click elsewhere on the chart to enlarge it.

Sources