Alphabeta Math
DefinitionDefinition: AI-adaptedProof: Not applicablePipeline-generated
How statement and proof provenance work

The first chip identifies the source of the statement or construction; the second identifies the source of its local proof or verification.

  • Literature-sourced: the exact statement appears in a cited source; only wording and notation differ.
  • AI-adapted: a semantically identical restatement of literature-sourced material, modulo indexing, notation, and boundary cases adopted by the library.
  • AI-generated: a genuinely novel statement formulated by AI, with no source for the claim itself.

These labels describe origin, not correctness: citations and verification chips remain separate evidence.

Predictable stopping-time grid

Definition

Assume T>0 and work on a filtered probability space with stopping times and stopped sigma-algebras as defined in Continuous-time stopping times and stopped sigma-algebras. A finite predictable stopping-time grid on [0,T] consists of an integer-valued random variable N with 1≤N<∞ almost surely and a sequence (τn)n≥0 of stopping times. It satisfies τ0=0, τn<τn+1 on {n<N}, and τn=T on {n≥N}. For every fixed integer n≥0, define hn=τn+1−τn and require that hn is Fτn-measurable; on {n<N} require also 0<hn≤hmax⁡ for a deterministic hmax⁡>0. Thus hn=0 on {n≥N}. A budgeted predictable grid has a deterministic integer B with N≤B almost surely.

The condition hn∈Fτn says the next interval is selected using information available at its left endpoint. Predictability is relative to the specified filtration: a step choice using a trial Brownian increment is excluded when it fails this measurability test. No Brownian motion or filtration-relative independence assumption is part of this definition. Brownian-bridge refinement can retain sampled increments, but retaining them does not by itself establish the required measurability of the step choice.

Depends on

Used by

Dependency tree · two levels

2 results within two dependency steps of this one, each drawn at its shortest distance from it. An arrow runs from a result to what uses it, so the chart reads left to right and ends at this result, which carries a heavier outline. Every node is a link to that result. Click elsewhere on the chart to enlarge it.

Sources