Alphabeta Math
ExampleConstruction: AI-generatedVerification: AI-generatedPipeline-generated
How statement and proof provenance work

The first chip identifies the source of the statement or construction; the second identifies the source of its local proof or verification.

  • Literature-sourced: the exact statement appears in a cited source; only wording and notation differ.
  • AI-adapted: a semantically identical restatement of literature-sourced material, modulo indexing, notation, and boundary cases adopted by the library.
  • AI-generated: a genuinely novel statement formulated by AI, with no source for the claim itself.

These labels describe origin, not correctness: citations and verification chips remain separate evidence.

A rarely sampled arm has a high-variance importance-weighted estimate

Example

Take one round with two actions, rewards (x1,1,x1,2)=(0,1), and sampling probabilities (P1,1,P1,2)=(1/10,9/10). The first arm's loss is 1, so its importance-weighted loss estimate is 10 with probability 1/10 and 0 with probability 9/10. Its mean is 1, second moment is 10, and variance is 9. The corresponding reward estimate is −9 or 1 with those respective probabilities, despite the true first-arm reward being 0.

Example references

Bandit importance-weighted estimator: the loss estimate is the observed loss divided by the probability of selecting its arm.

Conditional moments of the bandit importance-weighted estimator: the conditional mean, second moment, and variance formulas.

Facts & Assumptions

Given: One round, two arms, fixed rewards (0,1), and conditional arm probabilities (1/10,9/10).

[F1]

Bandit importance-weighted estimator: Y1=1−X1 and Y^1,i=1{A1=i}Y1/P1,i, with X^1,i=1−Y^1,i.

[F2]

Conditional moments of the bandit importance-weighted estimator: for loss yi and arm probability pi>0, the conditional mean, second moment, and variance are yi, yi2/pi, and yi2(1−pi)/pi.

Verification

1.1givenF1

The first-arm loss is y1,1=1. On A1=1, which has probability 1/10, its estimate is 1/(1/10)=10; on A1=2, which has probability 9/10, its estimate is zero.

1.2F2algebra

By [F2] with y=1 and p=1/10, the mean is 1, the second moment is 1/(1/10)=10, and the variance is 12(1−1/10)/(1/10)=9.

2.1F1step 1.1algebra∎

Since X^1,1=1−Y^1,1, its values are −9 and 1 on the two events, respectively, so it can fall outside the true reward range [0,1].

Depends on

Used by

Nothing in the library uses this result yet.

Dependency tree · two levels

8 results within two dependency steps of this one, each drawn at its shortest distance from it. An arrow runs from a result to what uses it, so the chart reads left to right and ends at this result, which carries a heavier outline. Every node is a link to that result. Click elsewhere on the chart to enlarge it.