Alphabeta Math
ExampleConstruction: AI-generatedVerification: AI-generatedPipeline-generatedjudge pass (gpt-6-luna)
How statement and proof provenance work

The first chip identifies the source of the statement or construction; the second identifies the source of its local proof or verification.

  • Literature-sourced: the exact statement appears in a cited source; only wording and notation differ.
  • AI-adapted: a semantically identical restatement of literature-sourced material, modulo indexing, notation, and boundary cases adopted by the library.
  • AI-generated: a genuinely novel statement formulated by AI, with no source for the claim itself.

These labels describe origin, not correctness: citations and verification chips remain separate evidence.

The all-zero loss boundary

Example

Let n,M≥1, B>0, α∈[0,B), and let every calibration and test loss be zero at every grid point. The rule passes at the first grid point exactly when α≥B/(n+1); when α<B/(n+1) it returns the maximum-grid fallback. In either case the selected test loss is zero and its expected risk is zero.

Example references

Facts & Assumptions

Given: The finite grid, the all-zero calibration and test losses, B>0, and α∈[0,B).

[F1]

The risk family uses a finite deterministic grid and bounded measurable loss rows; expected test risk is the expectation of the selected test loss. Finite nested decision families and bounded risk

[F2]

The algorithm selects the first grid point whose B-corrected calibration average is at most α, and falls back to the maximum point if none passes. Finite-grid conformal risk control

Verification

1.1givenF2algebra

At every grid point, the calibration threshold is (0+B)/(n+1)=B/(n+1). Hence, if α≥B/(n+1) the first point passes, while if α<B/(n+1) every point fails and the algorithm returns the fallback.

2.1givenF1step 1.1algebra∎

The test loss is zero at every grid point, including the first point and the fallback. Its expectation is therefore 0, which is at most α because α≥0.

Depends on

Used by

Nothing in the library uses this result yet.

Dependency tree · two levels

5 results within two dependency steps of this one, each drawn at its shortest distance from it. An arrow runs from a result to what uses it, so the chart reads left to right and ends at this result, which carries a heavier outline. Every node is a link to that result. Click elsewhere on the chart to enlarge it.

Sources