Alphabeta Math
LemmaStatement: Literature-sourcedProof: AI-adaptedPipeline-generatedprecheck pass
How statement and proof provenance work

The first chip identifies the source of the statement or construction; the second identifies the source of its local proof or verification.

  • Literature-sourced: the exact statement appears in a cited source; only wording and notation differ.
  • AI-adapted: a semantically identical restatement of literature-sourced material, modulo indexing, notation, and boundary cases adopted by the library.
  • AI-generated: a genuinely novel statement formulated by AI, with no source for the claim itself.

These labels describe origin, not correctness: citations and verification chips remain separate evidence.

Binary monotonicity excludes defiers

Statement

In the binary setup of Binary-instrument principal strata and LATE, assume monotonicity A(1)≥A(0) almost surely. Then the always-taker, never-taker and complier events are pairwise disjoint and cover Ω up to a null set; the defier event has probability zero.

Facts & Assumptions

Given: A(0),A(1)∈{0,1} and A(1)≥A(0) almost surely. Prove the principal-stratum partition.

[A1]

The potential treatments are binary and satisfy monotonicity almost surely. (Binary instrumental-variable potential-outcome setup)

[F1]

The four principal-stratum events are defined by the four possible pairs (A(0),A(1)). (Binary-instrument principal strata and LATE)

Proof

1.1givenA1F1algebra

Since each coordinate is either 0 or 1, the pair (A(0),A(1)) has only the four values (0,0),(0,1),(1,0),(1,1). Monotonicity in [A1] excludes (1,0) outside a null set. By [F1], the remaining three events are exactly the never-taker, complier and always-taker events.

2.1step 1.1F1∎

Distinct ordered pairs define disjoint events, and every pair outside the null exceptional set belongs to one of the three remaining events. Therefore these three strata form a partition up to a null set and the defier event is null.

Depends on

Used by

Dependency tree · two levels

5 results within two dependency steps of this one, each drawn at its shortest distance from it. An arrow runs from a result to what uses it, so the chart reads left to right and ends at this result, which carries a heavier outline. Every node is a link to that result. Click elsewhere on the chart to enlarge it.

Sources