How statement and proof provenance work
The first chip identifies the source of the statement or construction; the second identifies the source of its local proof or verification.
- Literature-sourced: the exact statement appears in a cited source; only wording and notation differ.
- AI-adapted: a semantically identical restatement of literature-sourced material, modulo indexing, notation, and boundary cases adopted by the library.
- AI-generated: a genuinely novel statement formulated by AI, with no source for the claim itself.
These labels describe origin, not correctness: citations and verification chips remain separate evidence.
Coherent SDP matrix-expectation oracle
Definition
Input rational parameters and , a choice of repeated controlled- or supplied controlled-power QA13 access with its declared costs, and an explicit finite purification circuit preparing a unit vector whose reduced state on register is , together with its inverse and any controlled versions. Also supply a finite unitary dilation of the two-outcome POVM for a Hermitian contraction , with an output bit and all work registers. Prepare the purification, apply to , and keep the outcome bit coherent; the resulting finite sampler has values and . Supply this signed sampler’s inverse, controlled calls, good and initial-state reflections, observable access, and all value/output encodings. Apply Amplitude-estimation expectation estimator to this sampler on with rational target and failure probability , using the selected access mode. Return its classical estimate together with the constructed coherent signed-sampler circuit and its declared access/cost description. The sampling tolerance reserves the other half of the requested tolerance for a purification-bias allowance in the consuming theorem. No inverse preparation is inferred from a measured postselected Gibbs state.
This procedure is distinct from the flagged-trace ratio route inside the sparse SDP solver; that route is specified by the solver's frozen round factory and trace-label construction. Every purification, observable, inverse, controlled call, dilation, measurement and compilation cost is separately charged.
Depends on
Used by
Dependency tree · two levels
52 results within two dependency steps of this one, each drawn at its shortest distance from it. An arrow runs from a result to what uses it, so the chart reads left to right and ends at this result, which carries a heavier outline. Every node is a link to that result. Click elsewhere on the chart to enlarge it.
Sources
- https://arxiv.org/pdf/1705.01843v4 (standard reference, not scraped)
- https://arxiv.org/pdf/1504.06987v3 (standard reference, not scraped)