Alphabeta Math
DefinitionDefinition: Literature-sourcedProof: Not applicableaudited 2026-09-12
How statement and proof provenance work

The first chip identifies the source of the statement or construction; the second identifies the source of its local proof or verification.

  • Literature-sourced: the exact statement appears in a cited source; only wording and notation differ.
  • AI-adapted: a semantically identical restatement of literature-sourced material, modulo indexing, notation, and boundary cases adopted by the library.
  • AI-generated: a genuinely novel statement formulated by AI, with no source for the claim itself.

These labels describe origin, not correctness: citations and verification chips remain separate evidence.

Time-constructible and space-constructible functions

Definition

Let t,s:N→N.

The function t is time-constructible when there exists a deterministic machine Ct such that, on unary input 1n, the machine halts within O(t(n)) steps and outputs the binary numeral bin⁡(t(n)).

The function s is space-constructible when there exists a deterministic machine Cs such that, on unary input 1n, the machine halts while using O(s(n)) tape cells and outputs the binary numeral bin⁡(s(n)).

On this page, whenever a constructible bound is used to clock another machine, we also require the evident size condition n≤t(n) for large enough n, so that the budget is at least large enough to read an input of length n.

Remarks

  • The definition records that the bound can itself be written down within the same asymptotic resource scale.

  • Standard polynomial and exponential time bounds that are eventually at least linear are time-constructible in this sense. Under the all-tapes space convention used here, no logarithmic-space claim is made: for example, a unary-input constructor for ⌈log⁡2(n+1)⌉ must reach the endmarker whenever it distinguishes the relevant input lengths, and therefore visits Ω(n) input-tape cells. The same input-reading obstruction makes an unbounded logarithmic bound non-time-constructible here.

Depends on

Used by

Dependency tree · two levels

6 results within two dependency steps of this one, each drawn at its shortest distance from it. An arrow runs from a result to what uses it, so the chart reads left to right and ends at this result, which carries a heavier outline. Every node is a link to that result. Click elsewhere on the chart to enlarge it.

Sources