How statement and proof provenance work
The first chip identifies the source of the statement or construction; the second identifies the source of its local proof or verification.
- Literature-sourced: the exact statement appears in a cited source; only wording and notation differ.
- AI-adapted: a semantically identical restatement of literature-sourced material, modulo indexing, notation, and boundary cases adopted by the library.
- AI-generated: a genuinely novel statement formulated by AI, with no source for the claim itself.
These labels describe origin, not correctness: citations and verification chips remain separate evidence.
A small expected cost can coexist with frequent finite-horizon violations
Example
Consider a one-state CMDP with actions safe and risky, deterministic self-transition, zero reward, discount , cost for safe, cost for risky, and cost threshold . The stationary policy chooses risky with probability at every decision, with independent action draws in the first seven decisions. Its expected discounted cost is , so it is feasible, while the probability of at least one cost during those seven decisions is .
Example references
The finite transition model, bounded cost signal, and stationary randomized policy.
Expected discounted-cost feasibility constraint: Expected discounted-cost feasibility is defined by .
Facts & Assumptions
Given: One state , two actions, deterministic self-transition, , cost , cost , threshold , and policy probability for risky at each step.
Finite discounted constrained Markov decision process: a finite CMDP's transition/reward masses and bounded transition-cost signals determine finite-time state and transition masses.
Expected discounted-cost feasibility constraint: is the discounted sum of the finite-time expected costs, and feasibility means .
For , , and for the series diverges: for , .
Verification
At every time , the state is and the expected one-step cost is . Thus by [F2] and [F3], .
Since , the policy is feasible under the expected discounted-cost constraint.
The probability that all seven independent action draws are safe is . Hence the probability of at least one cost is , as claimed.
Depends on
Used by
Nothing in the library uses this result yet.
Dependency tree · two levels
17 results within two dependency steps of this one, each drawn at its shortest distance from it. An arrow runs from a result to what uses it, so the chart reads left to right and ends at this result, which carries a heavier outline. Every node is a link to that result. Click elsewhere on the chart to enlarge it.