How statement and proof provenance work
The first chip identifies the source of the statement or construction; the second identifies the source of its local proof or verification.
- Literature-sourced: the exact statement appears in a cited source; only wording and notation differ.
- AI-adapted: a semantically identical restatement of literature-sourced material, modulo indexing, notation, and boundary cases adopted by the library.
- AI-generated: a genuinely novel statement formulated by AI, with no source for the claim itself.
These labels describe origin, not correctness: citations and verification chips remain separate evidence.
Work and idealized span of completed Parareal sweeps
Statement
Suppose initialization and all sweeps of Finite-budget Parareal correction sweeps complete successfully. They make fine calls and coarse calls. In an accounting model with constant nonnegative call costs , processors for a positive integer , fine calls scheduled without idle time in batches of except possibly the last, serial coarse calls, and additive synchronization cost per sweep, their modeled work and span are respectively This model excludes vector arithmetic, storage, certificate verification and any overhead other than the declared synchronization cost. It gives no measured speedup guarantee.
Facts & Assumptions
Given: Successful completion and the accounting model in the Statement; and are integers.
Finite-budget Parareal correction sweeps initializes one serial coarse row, then evaluates all fine calls and new coarse calls per sweep, reusing the preceding row's stored coarse values.
Proof
Initialization makes coarse calls. Each of the sweeps in [F1] makes fine calls and new coarse calls, so the totals are and . Multiplying by the stipulated costs and adding synchronization charges gives .
Each fine phase has independent equal-cost calls. Filling each batch except possibly the last gives batches, taking without idle time. Initialization takes , and each sweep has this fine phase followed by serial coarse calls and one synchronization charge. Adding these sequential phases gives , including and zero call costs.
Depends on
Used by
Nothing in the library uses this result yet.
Dependency tree · two levels
2 results within two dependency steps of this one, each drawn at its shortest distance from it. An arrow runs from a result to what uses it, so the chart reads left to right and ends at this result, which carries a heavier outline. Every node is a link to that result. Click elsewhere on the chart to enlarge it.
Sources
- R. D. Falgout et al., Parallel Time Integration with Multigrid (standard reference, not scraped)