Alphabeta Math
LemmaStatement: Literature-sourcedProof: AI-generatedPipeline-generatedprecheck passjudge pass (gpt-6-luna)
How statement and proof provenance work

The first chip identifies the source of the statement or construction; the second identifies the source of its local proof or verification.

  • Literature-sourced: the exact statement appears in a cited source; only wording and notation differ.
  • AI-adapted: a semantically identical restatement of literature-sourced material, modulo indexing, notation, and boundary cases adopted by the library.
  • AI-generated: a genuinely novel statement formulated by AI, with no source for the claim itself.

These labels describe origin, not correctness: citations and verification chips remain separate evidence.

Truncation and total-variation errors for stopped crossings

Statement

Assume AC. In the stopped-event setup of Finite-budget stopped-event kernel with a cemetery outcome, with (E,E) standard Borel and initial probability law μ, let p=Pμ(τT<τR) and let pm be the finite-budget normalizer of Finite-budget stopped-kernel measurability and event normalizer. Then 0≤p−pm=Pμ(τT<τR,τT>m)≤Pμ(τT∧τR>m). Thus the finite-budget stopped normalizer estimates the truncated event; a rate for its bias requires a tail bound for the stopping time. Separately, assume AC and let both finite-horizon Feynman–Kac models have the same finite horizon H∈N0, the same standard Borel state spaces (Xj,Xj) for 0≤j≤H, the same initial law μ0, and the same potentials Gj:Xj→[0,1] for 0≤j≤H. Let their transition kernels be Mj,M~j:Xj−1⇝Xj for 1≤j≤H, and suppose

sup⁡x∥Mj(x,⋅)−M~j(x,⋅)∥TV≤ϵj,ϵj≥0,

where ∥ν−ν′∥TV=sup⁡B∣ν(B)−ν′(B)∣. If ZHM and ZHM~ are the normalizers in the common Feynman–Kac setup of Feynman–Kac path targets and normalizers, then ∣ZHM−ZHM~∣≤∑j=1Hϵj. If a grid-detected crossing event Ah is contained in a continuous-time target event A, its probability bias is exactly P(A∖Ah); no grid-error rate follows without a separate path regularity or crossing-probability bound.

Facts & Assumptions

Given: AC, the standard Borel stopped-event model and its finite-budget probability, and two common finite-horizon Feynman–Kac models with identical initial law, state spaces, and potentials, differing only in transition kernels by the stated total-variation bounds.

[F1]

Finite-budget stopped-event kernel with a cemetery outcome: ∂ is the budget-censored outcome and κm records success only when the target is hit before return by time m.

[F2]

Measure kernel and probability kernel: A probability kernel has probability-measure rows and measurable evaluations.

[F3]

Probability measures and probability spaces: Probability measures have total mass one and are countably additive.

[F4]

Finite-budget stopped-kernel measurability and event normalizer: The finite-budget hit probability is pm=Pμ(τT<τR,τT≤m).

[F5]

Measurability of integration against a kernel: Integrating a bounded measurable function against a kernel gives a measurable function of the source state.

[F6]

Feynman–Kac path targets and normalizers: AC and a finite sequence of standard Borel state spaces, one initial law, and the ordered transition kernels and potentials define each finite-horizon Feynman–Kac normalizer.

Proof

1.1F1F3F4given

By [F4], pm=Pμ(τT<τR,τT≤m). The events increase to {τT<τR}, and the omitted part at budget m is {τT<τR,τT>m}⊆{τT∧τR>m}. Countable additivity [F3] gives the displayed difference and tail bound.

1.2F2F3F5F6givenalgebra

Replace the transition kernels one at a time and telescope the difference of the two normalizers. For the term replacing Mj, the earlier kernels and potentials define a finite measure of mass at most one, because the initial law is a probability and every potential lies in [0,1]. The remaining kernel-potential composition is a measurable function gj with 0≤gj≤1, measurable by [F5] and kernel composition. By the layer-cake identity gj(y)=∫011{gj(y)>t} dt, the total-variation definition bounds ∣Mjgj(x)−M~jgj(x)∣≤ϵj for every x. Integrating against that finite measure bounds the telescoping term by ϵj; summing yields ∑jϵj.

2.1F3givenalgebra∎

If Ah⊆A, then P(A)−P(Ah)=P(A∖Ah) by finite additivity on disjoint measurable sets. A bound on this value requires an additional estimate for the missed-crossing event; continuity of a path alone does not supply a uniform grid-rate without quantitative regularity.

Depends on

Used by

Dependency tree · two levels

22 results within two dependency steps of this one, each drawn at its shortest distance from it. An arrow runs from a result to what uses it, so the chart reads left to right and ends at this result, which carries a heavier outline. Every node is a link to that result. Click elsewhere on the chart to enlarge it.

Sources