Alphabeta Math
TheoremStatement: Literature-sourcedProof: AI-adaptedPipeline-generatedprecheck passjudge pass (gpt-6-luna)
How statement and proof provenance work

The first chip identifies the source of the statement or construction; the second identifies the source of its local proof or verification.

  • Literature-sourced: the exact statement appears in a cited source; only wording and notation differ.
  • AI-adapted: a semantically identical restatement of literature-sourced material, modulo indexing, notation, and boundary cases adopted by the library.
  • AI-generated: a genuinely novel statement formulated by AI, with no source for the claim itself.

These labels describe origin, not correctness: citations and verification chips remain separate evidence.

Projector phase operations from controlled reflections

Statement

Let Π be an orthogonal projection on a finite-dimensional space H, with reflection RΠ=2Π−I and SΠ=I−2Π=−RΠ. Suppose the control-first call C(RΠ) is explicitly supplied, together with an ancilla initialized in ∣0⟩ and exact one-qubit H and Rz gates. Then the unitary eiϕRΠ is implemented exactly by two controlled-reflection calls and one variable phase rotation, with a constant number of additional one-qubit gates, and the ancilla is returned to ∣0⟩. If an external branch qubit is present and a branch-controlled Rz(2ϕ) is supplied, controlling only that rotation implements the controlled projector phase; the two controlled-reflection calls remain unconditional with respect to the external branch. In QSVT the construction is applied separately to ΠR and ΠL; each projector-phase slot uses two controlled calls to the corresponding reflection. The access and gate costs are charged separately.

Facts & Assumptions

Given: The finite space H, an orthogonal projection Π, the specified controlled-reflection access, and a clean ancilla qubit.

[L1]

Orthogonal-Projector Reflection and Access Contract: RΠ=2Π−I and SΠ=I−2Π=−RΠ; RΠ is +I on ran⁡Π and −I on ker⁡Π.

[L2]

Controlled Unitary Access: C(V)=∣0⟩⟨0∣⊗IH+∣1⟩⟨1∣⊗V is the control-first unitary, and its availability is explicitly declared.

[L3]

Projector Reflections Are Hermitian Unitary Involutions: C(SΠ)=ZaC(RΠ), where Za=diag⁡(1,−1) acts on the control ancilla.

[L4]

Exact one-qubit gates and rotations: H=2−1/2(111−1) and Rz(θ)=exp⁡(−iθZ/2) are exact one-qubit gates.

[L5]

Denotational semantics of a finite layered circuit: chronological circuit operations compose in reverse order in the operator product.

Proof

1.1L1L2L3L4algebra

Define the ancilla-controlled bit flip XΠ:=HaC(SΠ)Ha, where Ha=H⊗IH. On ran⁡Π, SΠ=−I, so [L2] makes C(SΠ) act as Za on the ancilla; conjugating by Ha gives Xa. On ker⁡Π, SΠ=I, so C(SΠ) acts as I and XΠ is the identity. Thus XΠ flips the ancilla exactly on the range of Π. By [L3], each use of C(SΠ) is one supplied call to C(RΠ) plus one ancilla Za gate.

2.1L1L4step 1.1algebra

Apply XΠ, then Rz(2ϕ)=e−iϕZa, then XΠ again. On ran⁡Π, the ancilla operation is Xae−iϕZaXa=eiϕZa; on ker⁡Π it is e−iϕZa. Acting on ∣0⟩, these give phases eiϕ and e−iϕ, respectively, and both branches return the ancilla to ∣0⟩. The induced system operation is therefore eiϕ(Π)+e−iϕ(I−Π)=eiϕ(2Π−I).

3.1L2L3L4L5step 1.1step 2.1

The construction uses two occurrences of XΠ, hence two controlled-reflection calls by step 1.1, and one variable Rz(2ϕ) rotation. Its Hadamard and ancilla-Z gates have constant count per phase slot. Applying the same construction with ΠR or ΠL gives the two projector-phase operations used by the QSVT sequence; no direct or controlled reflection cost is inferred from the matrix description alone.

4.1L2L4step 1.1step 2.1algebra∎

Let c be an external branch qubit. Replace the middle rotation by its controlled version, leaving both occurrences of XΠ unchanged. On branch c=1, step 2.1 gives eiϕRΠ. On branch c=0, the middle operation is identity and the two adjacent XΠ operations cancel because XΠ2=I; the system operation is identity. Thus this is the controlled projector phase. It uses the same two controlled-reflection calls as the uncontrolled construction and one separately supplied and charged branch-controlled rotation.

Depends on

Used by

Dependency tree · two levels

34 results within two dependency steps of this one, each drawn at its shortest distance from it. An arrow runs from a result to what uses it, so the chart reads left to right and ends at this result, which carries a heavier outline. Every node is a link to that result. Click elsewhere on the chart to enlarge it.

Sources