Alphabeta Math
TheoremStatement: AI-adaptedProof: AI-adaptedPipeline-generated
How statement and proof provenance work

The first chip identifies the source of the statement or construction; the second identifies the source of its local proof or verification.

  • Literature-sourced: the exact statement appears in a cited source; only wording and notation differ.
  • AI-adapted: a semantically identical restatement of literature-sourced material, modulo indexing, notation, and boundary cases adopted by the library.
  • AI-generated: a genuinely novel statement formulated by AI, with no source for the claim itself.

These labels describe origin, not correctness: citations and verification chips remain separate evidence.

Variable-time amplitude-amplification theorem

Statement

Let a finite coherent variable-time algorithm satisfy Coherent variable-time algorithm model, with positive success probability p, maximum stopping count Tmax⁡≥1 and RMS stopping count Tav. Use the declared normalized operation-count coordinate, with actual preparation, controlled/inverse and input/selected-reflection costs included in the interval budgets. Put LT=max⁡(2,Tmax⁡) and n=1+⌈log⁡2LT⌉. The following resource regimes are distinct.

Supplied probability/schedule data. Suppose finite certified amplification-schedule data are supplied as in the model: on dyadic interval j, with original good-or-unfinished mass sj, previous selected mass rj−1 and actual qj=rj−1sj/sj−1, the odd multiplier dj=2kj+1 has resulting selected probability rj≥1/(16n) and rj≥(1−2/(5n))dj2qj. Unamplified intervals have dj=1,rj=qj. Supply a rational ℓ with rh/2≤ℓ≤rh for the final selected mass. Let Cbuild charge the actual finite construction/verification of these data and lists, including every oracle invocation used to obtain probability information. The resulting production procedure returns the exact conditional good state with success at least 1/2 at total cost Cbuild+O ⁣(Tmax⁡ln⁡LT+Tavp(ln⁡LT)3/2). The original logarithmic production bound is retained in this explicit probability-input regime. It does not assert free exact probability access or a uniform method obtaining those data at zero query cost. Repeating production O(ln⁡(1/ρ)) times gives success at least 1−ρ, with the actual construction cost charged once if its certified lists are reused.

Uniform finite estimated implementation. Instead supply only a positive rational success floor 0<p0≤p, failure 0<ρ<1/2, and the actual controlled/inverse/reflection access. No branch-probability advice is assumed. There is a finite estimated construction, described in the proof, preserving the exact conditional good state and succeeding with probability at least 1−ρ. Put c=1/100, qmin⁡=p0/(64n), and let r be the median count of Relative estimation of a promised coherent success probability at floor qmin⁡ and individual failure ρ/(16n). On a joint event of probability at least 1−ρ its complete construction-plus-production stage-call cost is O ⁣((r/c)n5/2(Tmax⁡+Tavp)). Every execution has the separately charged deterministic cap K=⌈225(r/c)n3Tmax⁡P0⌉,P0=min⁡{a∈N:a2p0≥1}. Exhaustion returns RESOURCE_TIMEOUT. State preparation, oracle/control/reflection implementation, finite list generation, output rounding and classical arithmetic/bit costs retain their actual separate coordinates; construction oracle calls are already counted in this cap. The efficient-grid rounding mode may be used for its proved polynomial-logarithmic postprocessing resources. This theorem makes no unproved unknown-p expected-time claim and does not equate this finite uniform overhead with the first regime's tighter production expression.

Facts & Assumptions

Given: The variable-time model in the Statement, its actual declared access/cost coordinate, and the data of the selected regime.

[F1]

Stopped branches are orthogonal and fixed by later stages (Coherent variable-time algorithm model).

[F2]

Ordinary amplification preserves the selected normalized component and gives selected probability sin⁡2(darcsin⁡q) (Exact success probability after amplitude amplification).

[F3]

Low-target amplification with a relative-1/100 estimate has selected probability at least 1/(16n) and multiplicative loss at most 2/(5n); the product loss over at most n amplified stages is bounded by 5/3 in the cost recurrence (Low-target amplification has a controlled multiplicative loss).

[F4]

The generic finite estimator supplies its joint relative-error and call-cost event with count at most 4160r/(cq), with the explicit controlled access and separately charged rounding costs (Relative probability estimation with a charged finite cap).

[F5]

Lower-bound capped amplification preserves the exact conditional selected state and has finite call cap 2RM with M<4/plow and R≤1+ln⁡(1/β)/ln⁡(4/3) (Finite amplification preserves the good state with a deterministic call cap).

Proof

1.1givenF1constructalgebra

Group the original operation-count execution into dyadic deadlines, assigning each stopped branch the first deadline after its original stopping count. All counts are positive integers in the declared coordinate. Treat an original stage as indivisible: group all stages ending by each deadline and use twice that deadline as its padded cumulative budget. The interval then covers every grouped whole-stage call. This changes maximum and RMS counts by at most four and leaves stopped branches untouched. There are at most n intervals with increments Δj summing to at most 4Tmax⁡. Their input/selected-reflection and preparation/control budgets are included, rather than treated as free additional operations. We retain this factor in the numerical constants below.

2.1F1F2step 1.1algebra

Let sj be the original probability of being already good or still unfinished at deadline j, with s−1=1. It decreases, is at least p>0, and has final value p. Construct Bj by running the preceding amplified list and continuing the original algorithm only on unfinished branches. Inductively its selected component is proportional to the original selected component, with probability qj=rj−1sj/sj−1; initially r−1=1. Amplify by the chosen odd multiplier. By [F2] this preserves the conditional selected state, and at the last deadline that state is the exact original conditional good state.

3.1F2F3step 2.1algebra

Let vj be the production-list cost and dj its amplification multiplier. Then vj≤dj(vj−1+Δj), with v−1=0. The supplied-regime certificate or [F3] gives dj≤rj/qj(1−2/(5n))−1/2 on amplified intervals, with no loss on unamplified intervals. Expand the recurrence. For each summand, ∏ℓ=jhrℓ/qℓ=rhsj−1rj−1p. The total loss is at most 5/3, and rj−1≥1/(16n) (with initial value one), so vh≤6nrh/p∑jΔjsj−1. The same bound holds for every prefix with its corresponding ri,si.

3.2F2F3F4step 2.1algebra

In the uniform regime use [F4] with c=1/100, floor qmin⁡=p0/(64n) and failure β=ρ/(16n) at each of at most n intervals. All estimation workspaces are fresh construction data, discarded before production. On the estimator-good event, a returned q^>1/(9n) uses d=1 and actual r=q>(100/101)/(9n)>1/(16n), with loss one. Otherwise choose the least odd d with d2q^≥1/(9n); search only through k≤⌈1/qmin⁡⌉ and return failure if no crossing is found. [F3] gives the same surviving floor and loss bound in this case. Inductively qj≥p/(16n)≥p0/(16n)>qmin⁡, so every estimator promise is met on this joint event; a zero estimate or exhausted search is then impossible. The actual upper bound r≤1/n is neither claimed nor used.

4.1F1F5step 1.1step 3.1algebra

Write uj−1 for original unfinished mass at the preceding deadline. Since sj−1≤p+uj−1 and Δjuj−1≤2Tav by the dyadic stopping convention (also at the first interval, because stopping counts are at least one), S:=∑jΔjsj−1≤4(Tmax⁡p+nTav). In the supplied-data regime apply [F5] at lower bound ℓ≥rh/2 and constant failure 1/2. Its O(rh−1/2) factor cancels rh in step 3.1, proving production cost O(Tmax⁡n+(Tav/p)n3/2). Substitute n=O(ln⁡LT) and add the actual Cbuild, including its probability-acquisition oracle calls. Independent repetitions give the stated confidence. No construction-cost bound follows solely from existence of true-probability-selected multipliers.

5.1F3F4F5step 3.1step 4.1step 3.2algebra

The prefix version of step 3.1 and rj−1≥1/(16n) give the next sampler cost bi the bound bi/qi≤10nS/p. Use step 4.1 and [F4] to charge every estimation call. Summing at most n stages gives at most 218(r/c)(n3/2Tmax⁡+n5/2Tav/p) with slack for dyadic padding. Final production has vh≤6nS/p. Apply [F5] with floor 1/(18n) and failure ρ/4: its range is M<17n, and its trial count R is at most 32r. Thus its complete additional cost fits within 220(r/c)n5/2(Tmax⁡+Tav/p), again with slack for the already charged reflection/interval overhead. This proves the stated joint-event bound and includes the quantum cost of acquiring probability data.

6.1F1F2F4F5step 3.2step 5.1algebra∎

The computable integer P0 satisfies P0≥1/p0 and P0<2/p0. Since Tav≤Tmax⁡ and p≥p0, the joint-event cost in step 5.1 is below K. Count all construction, production, inverse/control/reflection stage calls and final amplification against K, stopping before an excess. The resource timeout therefore never occurs on the joint estimator-good event. Its complement has probability at most nβ≤ρ/16 by [F4] and the union bound. Conditional on the good construction event, final capped amplification fails with probability at most ρ/4. Total failure is at most 5ρ/16<ρ. Every heralded good branch has the same conditional original state by step 2.1, even after averaging the classical construction transcript. The procedure is finite on every branch by its explicit caps.

Remarks

The probability-resource inputs in the model distinguish supplied certified schedule data from unknown black-box probabilities. The tight production expression charges the former through Cbuild, including any oracle calls needed to obtain them; the finite uniform variant states its floor, confidence, estimation overhead and cap separately. An unknown-probability uniform worst-case bound cannot be inferred from the ideal-list recurrence: already a one-stage hidden-label rotation family yields the finite-transcript/continuity obstruction documented in the owner repair evidence. This corrects an ambiguous local resource interpretation and does not refute the cited source theorem under its intended conventions. No unproved unknown-p expected-time claim is used here.

Depends on

Used by

Dependency tree · two levels

63 results within two dependency steps of this one, each drawn at its shortest distance from it. An arrow runs from a result to what uses it, so the chart reads left to right and ends at this result, which carries a heavier outline. Every node is a link to that result. Click elsewhere on the chart to enlarge it.

Sources