Alphabeta Math
TheoremStatement: Literature-sourcedProof: AI-adaptedPipeline-generated
How statement and proof provenance work

The first chip identifies the source of the statement or construction; the second identifies the source of its local proof or verification.

  • Literature-sourced: the exact statement appears in a cited source; only wording and notation differ.
  • AI-adapted: a semantically identical restatement of literature-sourced material, modulo indexing, notation, and boundary cases adopted by the library.
  • AI-generated: a genuinely novel statement formulated by AI, with no source for the claim itself.

These labels describe origin, not correctness: citations and verification chips remain separate evidence.

Finite adiabatic path simulation from term access

Statement

Let H(s) be a finite-dimensional Hermitian path with an access instance from Adiabatic path access and resource model, a supplied exact preparation isometry A0 of cost Cinit, and finite rational certificates M1≥sup⁡s∥H′(s)∥ and B as required by Discretized adiabatic path simulation schedule. Suppose all coefficient evaluations, supported term-time calls, and their certified errors are available. For every nonnegative finite exact time code T supported by the term-list access model and rational 0<ε≤1, the algorithm in Discretized adiabatic path simulation schedule yields a finite access schedule whose unitary evolution block U~T(1) satisfies ∥U~T(1)−UT(1)∥≤ε. Before any declared output procedure, its composition with the preparation obeys ∥U~T(1)A0−UT(1)A0∥≤ε. When all required term operations have full-list uniform circuit-family providers and the resulting circuit generator, including coefficient evaluation and wrapper construction, runs in polynomial time, the schedule expands to a full-list uniform circuit family. If named-oracle providers are used, the schedule records and charges each such query. Its cost record contains Cinit plus all grid, term-query, gate, ancillary-wire, coefficient-bit, description-bit, and generator-time costs supplied by the access instance.

Facts & Assumptions

Given: A uniformly described finite path access instance, its exact preparation circuit and costs, T, ε, and the certificates required by the discretized simulator.

[F1]

The finite path evolution and preparation interface are specified by Finite adiabatic path model and Adiabatic path access and resource model.

[F2]

The discretized algorithm specifies the grid, rational coefficient approximations, product-formula calls, provider errors, finite loop bounds and resource coordinates (Discretized adiabatic path simulation schedule).

[F3]

For self-adjoint summands, the first-order formula with r steps has error at most t2/(2r) times the sum of pairwise commutator norms (First-order Lie product formula, First-order commutator error).

[F4]

Finite Hermitian evolutions and term-exponential providers are unitary; the operator norm is submultiplicative and invariant under unitary multiplication (Finite Hermitian matrix dynamics, Term-list Hamiltonian access, The operator norm is zero on the zero domain and otherwise is max_{||v||=1} ||Tv||, The operator norm is submultiplicative and satisfies ||T^*T|| = ||T||^2).

[F5]

The vector norm satisfies the triangle inequality, so the operator norm does also: for every unit v, ∥(A+B)v∥≤∥Av∥+∥Bv∥≤∥A∥+∥B∥, and taking the maximum gives ∥A+B∥≤∥A∥+∥B∥ (The operator norm is zero on the zero domain and otherwise is max_{||v||=1} ||Tv||, The inner-product norm is definite, homogeneous, and satisfies the triangle inequality). For a continuous finite-matrix-valued function, the same triangle inequality on finite Riemann sums and passage to the limit gives ∥∫F(u) du∥≤∫∥F(u)∥ du.

Proof

1.1F1F2

If T=0, the exact evolution is I, so the supplied preparation and output procedure have zero evolution error. Suppose T>0. Let M be the finite term count and use the finite rational certificates in [F2] to compute q,τ,rPF.

1.2F1F2F4F5constructalgebra

In physical time u∈[0,T], the generator is H(u/T). On the jth interval [a,b] of length τ, compare it with the frozen generator H(sj), sj=j/q. For the exact propagator U(b,u) and frozen propagator V(u,a), differentiating U(b,u)V(u,a) and integrating gives V(b,a)−U(b,a)=i∫abU(b,u)(H(u/T)−H(sj))V(u,a) du. Unitarity [F4] and the integral norm bound [F5] bound the segment operator error by ∫ab∥H(u/T)−H(sj)∥du≤M1τ2/(2T). The derivative certificate and coordinatewise fundamental theorem of calculus give ∥H(s)−H(sj)∥≤M1∣s−sj∣. Summing over q intervals gives TM1/(2q)≤ε/6 by the definition of q (and it is zero when M1=0).

2.1F2F4F5step 1.2algebra

Replacing each frozen H(sj) by its certified rational approximation H~j changes its time-τ propagator by at most τε/(3T) by the same Duhamel estimate. Telescoping the q unitary segments using [F5] bounds the total coefficient-approximation error by qτε/(3T)=ε/3.

3.1F2F3F4F5step 2.1algebra

The summands c~jkHk are self-adjoint because the coefficients are real. By [F3], the ideal first-order product formula for each frozen segment has error at most τ2B/(2rPF)≤ε/(6q); if B=0, the error is zero. Telescoping over the q unitary segments using [F5] gives product-formula error at most ε/6.

4.1F1F2F4F5step 1.2step 2.1step 3.1algebra

There are exactly qMrPF term-exponential calls. Replacing each by its declared unitary provider changes the composed schedule's evolution block by at most the sum of the call errors, using [F4]–[F5], so this contribution is at most qMrPF⋅ε/(6qMrPF)=ε/6. The total evolution error is at most ε/6+ε/3+ε/6+ε/6=5ε/6≤ε. Since A0 is an isometry, ∥A0∥=1, and submultiplicativity gives ∥U~T(1)A0−UT(1)A0∥≤ε.

5.1F1F2step 1.1algebra∎

Each computed loop count is a finite integer fixed by the exact finite inputs, and every requested time code, coefficient approximation and provider has a finite supported description under the stated availability conditions. The algorithm therefore terminates with the access schedule specified in [F2]. When its circuit-family and polynomial-generation conditions hold, it expands to the uniform circuit family in the Statement; named-oracle calls remain charged query steps. Its preparation, queries, gates, ancillas, precision bits, circuit-description bits and generation costs are charged as stated in [F1]–[F2]. For T=0 termination and exactness were established in step 1.1.

Depends on

Used by

Dependency tree · two levels

52 results within two dependency steps of this one, each drawn at its shortest distance from it. An arrow runs from a result to what uses it, so the chart reads left to right and ends at this result, which carries a heavier outline. Every node is a link to that result. Click elsewhere on the chart to enlarge it.

Sources