Alphabeta Math
TheoremStatement: Literature-sourcedProof: AI-adaptedPipeline-generatedjudge pass (gpt-6-luna)
How statement and proof provenance work

The first chip identifies the source of the statement or construction; the second identifies the source of its local proof or verification.

  • Literature-sourced: the exact statement appears in a cited source; only wording and notation differ.
  • AI-adapted: a semantically identical restatement of literature-sourced material, modulo indexing, notation, and boundary cases adopted by the library.
  • AI-generated: a genuinely novel statement formulated by AI, with no source for the claim itself.

These labels describe origin, not correctness: citations and verification chips remain separate evidence.

Circuit-to-adiabatic simulation

Statement

Let a uniform circuit have n≥1 data qubits and L≥1 gates, each on at most two data qubits. For rational 0<ε≤1, set K=⌈2L/ε⌉ and N=L+K. The construction in Five-local history-state adiabatic path is a five-local finite Hermitian path with a product initial ground state, a unique ground state along the path, gap greater than 3/[864(N+1)3], derivative bound ∥H′∥≤3N, and H′′=0. If its term-time providers supply every call required by Discretized adiabatic path simulation schedule with the requested certified error at polynomial cost, and coefficient evaluations and output operations also have polynomial cost, the initial ground state can be evolved and the clock discarded to produce a data state at trace distance at most ε from the circuit output, using T=O(N11/ε)=O(L11ε−12) continuous evolution time and polynomially many charged term calls, gates, coefficient bits and generator steps. The initial preparation cost, local term access costs, precision costs and output costs are recorded separately by Adiabatic path access and resource model.

Facts & Assumptions

Given: The uniformly described circuit, its explicitly supplied all-zero preparation, rational ε, and declared polynomial-cost term and coefficient providers for the path.

[F1]

The five-local path is defined in Five-local history-state adiabatic path, with explicit initial preparation and term access coordinates in Adiabatic path access and resource model.

[F2]

Its final history state has data marginal within L/(N+1)≤ε/2 of the circuit output (History state and padded output).

[F3]

The full path has a unique ground state and gap greater than 3Δ0/4, with Δ0=1/[216(N+1)3] (Full-space history-path gap).

[F4]

The finite-rank JRS bound controls the projector error by A1(1) (Finite JRS adiabatic projector bound).

[F5]

Partial trace contracts trace distance (Partial trace contracts trace distance); for pure states trace distance equals the square root of one minus squared overlap (Pure state trace distance).

[F6]

The proved path simulator supplies an access schedule with the requested operator error and charges the declared access and preparation costs; circuit-family providers compile to a circuit family under the stated polynomial-generation condition, while named-oracle calls retain their query charges (Finite adiabatic path simulation from term access).

[F7]

Trace norm satisfies the triangle inequality, so trace distance satisfies it on density operators (Trace Norm Duality And Norm Properties, Trace Distance).

Proof

1.1F1F3algebra

Write H(s)=(1−s)Hinit+sHfinal. The common Hinput and JHclock terms cancel in H′, leaving H′=Hprop−Hclock0, so ∥H′∥≤3N from the term bounds, and H′′=0. By [F3], the full ground gap is at least γ:=3Δ0/4=1/[288(N+1)3] throughout the path. Each term of Hinit=Hinput+Hclock0+JHclock is positive semidefinite. A binary string has no adjacent 01 pair exactly when all of its 1 bits precede all of its 0 bits, so Hclock vanishes exactly on the legal unary clocks. On those clocks Hclock0 vanishes only at c0; at c0, the input penalty vanishes exactly on ∣0n⟩. Thus the unique initial ground vector is ∣0n⟩∣c0⟩, whose supplied preparation is included in [F1].

2.1F3F4step 1.1algebra

In the rank-one JRS expression from [F4], each endpoint term is at most 3N/γ2, and the integral term is at most 7(3N)2/γ3 because H′′=0. Put BT=6Nγ2+63N2γ3,T=⌈4BTε⌉. Then A1(1)≤BT/T≤ε/4. Since γ−1=288(N+1)3, we have BT=O(N11) and T=O(N11/ε). Also K=Θ(L/ε) and N=Θ(L/ε) for L≥1, ε≤1, giving the stated O(L11ε−12) bound.

3.1F4F5step 2.1algebra

Let ψT be the ideal evolved unit vector and η the final ground vector. The JRS projector estimate gives ∥∣ψT⟩⟨ψT∣−∣η⟩⟨η∣∥≤ε/4. For rank-one projections the operator norm of their difference equals their trace distance: on the span of the two vectors the difference has eigenvalues ±1−∣⟨ψT,η⟩∣2, and it vanishes on the orthogonal complement. Thus their full-register trace distance is at most ε/4.

4.1F5F6step 3.1algebra

Run the proved simulator [F6] with tolerance ε/4 and execute its schedule on the supplied initial vector. If ψ~T is the resulting unit vector, operator-norm error gives ∥ψ~T−ψT∥≤ε/4. Put c=⟨ψT,ψ~T⟩. By [F5], the pure-state trace distance squared is (1−∣c∣)(1+∣c∣)≤2(1−∣c∣)≤2−2Re⁡c=∥ψ~T−ψT∥2, so it is at most ε/4. By partial-trace contractivity, tracing out the clock does not increase either this error or the adiabatic error in step 3.1.

5.1F2F5F7step 3.1step 4.1algebra

The data marginal of ∣η⟩ is within ε/2 of the target circuit output by [F2]. By [F7], the triangle inequality for trace distance, steps 3.1–4.1, and the padding estimate give total output distance at most ε/4+ε/4+ε/2=ε.

6.1F1F6step 2.1algebra∎

The term list has M=n+N+N+(N−1)=n+3N−1≤n+3N terms: n input projectors, N clock-potential projectors, N propagation terms, and N−1 clock-penalty projectors. Each has norm at most 1 by the local block calculation in the proof of the full-gap lemma and the projection form of the other terms. Set the certified derivative bound to M1=3N. The coefficient functions are the constants 1, J, and the affine functions s and 1−s; at rational grid points they are exactly computable rationals, so take zero coefficient error. For every sample, each coefficient has magnitude at most J and each term norm is at most 1, whence ∑p<q∥[Ap,Aq]∥≤2(M2)J2≤M2J2; use the finite rational certificate B=M2J2. The value of J=2K0+864K02(N+1)3+1 is polynomial in n,N, so M1,B and all coefficient encodings have polynomial bit length. With T=⌈4BT/ε⌉=O(N11/ε) and M1=3N, the grid count q=O(TN/ε) is polynomial. Since τ=T/q≤ε/(9N), the product-formula count rPF≤1+3qτ2B/ε=1+3TτB/ε is polynomial as well. Thus [F6] executes finitely many, polynomially many term calls, and by hypothesis their requested-error providers, coefficient procedures and output operation have polynomial charged cost. Preparation cost, queries, gates, ancillas, coefficient precision, circuit-description bits and generator time are all separately recorded; no spectral projector is used to prepare the initial state.

Depends on

Used by

Nothing in the library uses this result yet.

Dependency tree · two levels

65 results within two dependency steps of this one, each drawn at its shortest distance from it. An arrow runs from a result to what uses it, so the chart reads left to right and ends at this result, which carries a heavier outline. Every node is a link to that result. Click elsewhere on the chart to enlarge it.

Sources